You can always press Enter⏎ to continue
hardhat
Rogers Electric
Front End Redesign Nightly Checklist
18
Questions
START
1
Store Number
*
This field is required.
Previous
Next
Submit
Press
Enter
2
Date
*
This field is required.
-
Date
Year
Month
Day
Previous
Next
Submit
Press
Enter
3
Time
*
This field is required.
1
2
3
4
5
6
7
8
9
10
11
12
1
1
2
3
4
5
6
7
8
9
10
11
12
Hour
00
05
10
15
20
25
30
35
40
45
50
55
55
00
05
10
15
20
25
30
35
40
45
50
55
Minutes
AM
PM
AM
AM
PM
Previous
Next
Submit
Press
Enter
4
Crew Lead
*
This field is required.
Previous
Next
Submit
Press
Enter
5
Pods/Desks Taken Down (list each and be specific)
*
This field is required.
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
6
Pods/Desks Installed (power/data working, tested, photos taken)
*
This field is required.
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
7
*
This field is required.
Pictures of Pods/Registers Installed and Functional
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
8
What time did the reset team turnover the pods?
*
This field is required.
Previous
Next
Submit
Press
Enter
9
What time did Rogers turn first pod over to IT?
*
This field is required.
Previous
Next
Submit
Press
Enter
10
What time was pod power/data on, tested and verified?
*
This field is required.
Previous
Next
Submit
Press
Enter
11
Beverage Coolers/Coffee/Gourmet Islands Installed (list each and be specific)
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
12
Pictures of Beverage Coolers/Coffee/Gourmet Islands Installed
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
13
Is anything worked on last night incomplete? Explain.
*
This field is required.
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
14
Misc Work (sensormatics, front wall cleanup, ceiling cleanup, cart chargers, etc.)
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
15
Pictures of Misc Work (sensormatics, front wall cleanup, ceiling cleanup, cart chargers, etc.)
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
16
Locker Power/Data complete?
Previous
Next
Submit
Press
Enter
17
Picture of Locker Power/Data
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
18
Is any material missing? Do you need additional material? List below.
*
This field is required.
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
Should be Empty:
HD268 Front End Nightly Checklist
[Edit]
Question Label
1
of
18
See All
Go Back
Submit